Vista Ridge Concrete Pumping
  • Services
    • Boom Pumping
    • Line Pumping
    • Telebelt Placement
  • Fleet
  • Pump Specs
    • Schwing S 28 X
    • Schwing S 31 XT
    • Schwing S 36 X
    • Schwing S 38 SX
    • Schwing S 47 SX
    • Alliance 47 LRZ
    • Putz 47 Z
    • Alliance 50 RZ
    • Schwing S 61 SX
    • Schwing S 65 SXF
    • Putz Telebelt TB 110
    • Schwing Loopbelt 130
    • Schwing BPL 2000
    • Somero Line Dragon
    • Spider 18-RZ
  • About
  • Resources
    • Gallery
    • Employment
    • Maintenance
    • Unique Applications
  • Contact
  • (972) 316-0148
Select Page
Back To Gallery

Lake Lewisville Toll Bridge

Lake Lewisville Toll Bridge
Lake Lewisville Toll Bridge zoomed out view
Lake Lewisville Toll Bridge up close

Vista Ridge Concrete Pumping provided general contractor Jensen Construction a 61M &/or 52M along with a 40′ Mini-Placer for this 1.75 mile $125 Million Toll Bridge over Lake Lewisville. All deck pours were made in a “leap-Frog’ method in which the pump and ready-mix trucks were set-up on decks poured 10 days prior.

← Residential Concrete Pumping Projects The DART Rail "Green Line" →

Archives

No archives to show.

Categories

  • No categories
    Concrete Pumping in Lewisville, Dallas, & Fort Worth, TX | © VRCP LLC | Privacy Policy